RAIL / TRACKWORK

Folsom Blue Ravine Rail Road Crossing

Project Name: Blue Ravine Railroad Crossing

Location: Folsom, CA

Owner: City of Folsom

Owner Contact: Larry Curtis – (916) 355-7382

Prime Contractor: Con-Quest Contractors, Inc.

Prime Contractor: Contact 415.206.0524

Architect/Engineer: Owner

Architect/Engineer Contact: N/A

Construction Manger Contact: N/A

Description Of Project Scope: Remove & Replace an existing 120 LF wood tie and rubber panel railroad crossing within a major thoroughfare with new concrete ties and concrete panels. Included in the work was a new drainage system, milling and filling new conforms to improve the transition across the tracks. All work was field fit by C-QC. Initially the project called for the work to be completed during weekdays, C-QC negotiated a 48 hour continuous work window to complete all the work. C-QC completed the work 26 hours ahead of the agreed 48 hour schedule.

Original Bid Amount: $194,350.00

Change Orders: $47,198

Claims: $ ---0---

Final Contract Value: $241,548.65

Original Start Date: June 10, 2009

Original Duration: 30 Working Days

Original Completion Date: July 22, 2009

Time Extension Granted In Days:

Actual Completion Date: June 26, 2009

Liquidated Damages: None

Recordable Accidents/ RAF: Zero / 0

Lost Time Accidents/ LAF: Zero / 0

OSHA Violations/ Fines: None

DOWNLOAD PDF

Blue-Ravine-Folsom.jpg

Hamilton MSE Wall Stabilization

Project Name: Hamilton MSE Wall Repairs

Location: Campbell, CA

Owner: Santa Clara Valley Transportation Authority

Owner Contact: Ed Pasucal – 408.952.8964

Prime Contractor: Con-Quest Contractors, Inc.

Prime Contractor Contact:

Architect/Engineer: Parsons Brinckerhoff

Architect/Engineer Contact: N/A

Construction Manger Contact: N/A

Description Of Project Scope: This project included making drainage improvements and repairs to an existing MSE wall which suffered from settlement.

Work included:

- Installation of +- 400 lf of subsurface drainage lines.

- Erosion Control implementation.

- Excavation in trackway on an elevated platform during a weekend system shutdown.

- Installation of 1,000 sf of concrete pavers, new metal fence and gate system.

- Change Order work issued to adjust existing LRT track to maintain vertical & horizontal clearances at platform edge. Involved removing ballast, lowering track, adjustment of ties and tamping.

Original Bid Amount: $343,649

Change Orders: $61,535

Claims: $ ---0---

Final Contract Value: $405,184

Original Start Date: August 27, 2009

Original Duration: 65 Calendar Days

Original Completion Date: October 31, 2009

Time Extension Granted In Days: 45 Calendar Days

Actual Completion Date: December 14, 2010

Liquidated Damages: None

Recordable Accidents/ RAF: Zero / 0

Lost Time Accidents/ LAF: Zero / 0

OSHA Violations/ Fines: None

DOWNLOAD PDF

hamilton.jpg

PCJPB Signal Optimization

Project Name: Signal Optimization Project

Location: Santa Clara County, San Mateo County

Owner: Peninsula Corridor Joint Powers Board

Owner Contact: Richard McIntosh – 408.234.6378

Prime Contractor: Granite Construction Company

Prime Contractor: Contact Joel Jimenez – 408.842.9148

Architect/Engineer: Rail Surveyors and Engineers, Inc.

Architect/Engineer Contact: N/A

Construction Manger Contact: N/A

Description Of Project Scope: Installation of 24 insulated joint plugs (136 # rail) with 48 thermite welds mainline track. Replacement of wood ties & replacement of rods for 2 new switch machines. All work was performed during scheduled night shut-down operations in between revenue hours of commuting trains.

Realignment of 400 lf of siding track

Original Bid Amount: $169,000.00

Change Orders: $30,996.84

Claims: $ ---0---

Final Contract Value: $199,996.84

Original Start Date: August, 2010

Original Duration:

Original Completion Date: October, 2009

Time Extension Granted In Days: N/A – C-QC was a subcontractor

Actual Completion Date: August, 2010 for C-QC’s portion of work

Liquidated Damages: None

Recordable Accidents/ RAF: Zero / 0

Lost Time Accidents/ LAF: Zero / 0

OSHA Violations/ Fines: None

DOWNLOAD PDF

PCJB.jpg

Hardwood Spur Track Removal

Project Name: Hardwood Spur Removal and Spot Tie Repair

Location: San Jose, CA

Owner: Santa Clara Valley Transportation Authority

Owner Contact: Ed Pasucal – 408.952.8964

Prime Contractor: Con-Quest Contractors, Inc.

Prime Contractor Contact: Alex Baranoff

Architect/Engineer: SCVTA

Architect/Engineer Contact: N/A

Construction Manger Contact: N/A

Description Of Project Scope: This project included removal of an existing track turnout and reconstructing into a section of straight track in addition to spot tie repair in multiple locations along the rail system. All work associated with this project was performed under a weekend shut-down with a round the clock schedule.

- Remove existing turnout

- Install 300 lf of new track

- 9 thermite rail welds

- Replaced 50 timber rail ties in live track between train service

 Original Bid Amount: $ 118,499.00

Change Orders $ 41,486.00

Claims $ ---0---

Final Contract Value: $ 159,985.00

Original Start Date: December 20, 2010

Original Duration: 120 Calendar Days

Original Completion Date:  April 18, 2011

Time Extension Granted In Days: 56 Calendar Days

Actual Completion Date: June 13, 2011

Liquidated Damages None

Recordable Accidents/ RAF Zero / 0

Lost Time Accidents/ LAF Zero / 0

OSHA Violations/ Fines: None

DOWNLOAD PDF

hardwood-spur.jpg

Market & Almaden Rail Replacement

Project Name: Rail Rehabilitation – Market Street and Almaden Blvd. Crossings

Location: San Jose, CA

Owner: Santa Clara Valley Transportation Authority

Owner Contact: Ed Pasucal – 408.952.8964

Prime Contractor Stacy & Witbeck /Con-Quest J.V.

Prime Contractor Contact

Architect/Engineer: Rail Surveyors & Engineers, Inc.

Architect/Engineer Contact: N/A

Construction Manger Contact: N/A

Description Of Project Scope: - Remove and replace 858 track feet of concrete embedded track during weekend shut-downs in congested and tight quarter downtown conditions. Work was performed in three 72 hour around the clock operations.

- Install 8 pair of compromised joint bars

- Perform 18 Thermite welds

- Traffic control and detours to maintain downtown traffic flow

- Trench in existing tile paver sidewalk to install 160 lf of conduit. Cut in grout seams to replace pavers to previous condition.

Original Bid Amount: $ 1,337,842

Change Orders $ 15,969

Claims $ ---0---

Final Contract Value: $ 1,353,811

Original Start Date: September, 2009

Original Duration:

Original Completion Date: June, 2010

Time Extension Granted In Days: N/A

Actual Completion Date: June, 2010

Liquidated Damages None

Recordable Accidents/ RAF Zero / 0

Lost Time Accidents/ LAF Zero / 0

OSHA Violations/ Fines: None

DOWNLOAD PDF

Project-Brochure-Market.jpg

MUNI Emergency Rail Replacement

Project Name: MUNI – Emergency Rail Replacement @ Metro Green Yard

Location: San Francisco, CA

Owner: SF MUNI

Owner Contact: Rajendra Desai – 415.215.1367

Prime Contractor: Yerba Buena Engineering & Construction

Prime Contractor Contact: Juan Barraza - 415.822.4400

Architect/Engineer: MUNI

Architect/Engineer Contact: N/A

Construction Manger Contact: N/A

Description Of Project Scope: This project included emergency repairs directed by owner. Necessary work included demo of existing ac to expose rail to investigate. Replacement of 2,925 lf of curved rail for the “ladder” in the maintenance yard. Replacement of 130 joint bars, weld and grind as necessary to smooth top of rail joints. Replaced 125 wooden ties and hand tamped to align rail.

Performed 36 thermite welds on premium rail for new tunnel track.

Original Bid Amount: N/A – Work was based on Time and Material basis

Change Orders: $ N/A

3 $ ---0---

Final Contract Value: $ 966,097.38

Original Start Date:

Original Duration:

Original Completion Date: N/A

Time Extension Granted In Days: N/A

Actual Completion Date: N/A

Liquidated Damages: None

Recordable Accidents/ RAF: Zero / 0

Lost Time Accidents/ LAF: Zero / 0

OSHA Violations/ Fines: None

DOWNLOAD PDF

Project Brochure - Job 28 - MUNI Emergency Rail Repairs.jpg

Rail Rehabilitation – Hamilton Avenue Freight Crossing Repair

Project Name: Rail Rehabilitation – Hamilton AvenueFreight Crossing Repair

Location: Campbell, California

Owner: Valley Transit Authority

Owner Contact: Edgardo, Pasucal

Prime Contractor: Con-Quest Contractor, Inc.

Prime Contractor Contact Charles Zelnik

Architect/Engineer: BKF

Architect/Engineer Contact: N/A

Construction Manger Contact: N/A

Description Of Project Scope:

This project included removal of 180 feet of freight track to replace sub-base with asphalt and then reinstall track and conform pave both the North and South Bound lanes. All work associated with this project was performed under a weekend shut-down with a round the clock schedule. 

Project included:

-        Remove and install 180 feet track with 66  bolted concrete panels

-        4 Thermite welds

-        Replacement of 14 timber rail ties

-        Placing 262 ton of asphalt for sub-base and conform paving

(Be Specific Qty's & Sizes)

Original Bid Amount: $98,500.00

Change Orders: $162,000.00

Claims: $ ---0---

Final Contract Value: $260,500.00

Original Start Date: May 7, 2012

Original Duration: 100 Days

Original Date: August 14, 2012

Time Extension Granted In Days: 50 Days

Actual Completion Date: November 14, 2012

Liquidated Damages: None

Recordable Accidents/ RAF: Zero / 0

Lost Time Accidents/ LAF: Zero / 0

OSHA Violations: None

DOWNLOAD PDF

Project Brochure - Job 40 - Hamilton UPRR Crossing.jpg

Penninsula Corridor Signal Optimization

Project Name: Signal Optimization Project

Location: Santa Clara County, San Mateo County

Owner: Peninsula Corridor Joint Powers Board

Owner Contact: Richard McIntosh – 408.234.6378

Prime Contractor: Granite Construction Company

Prime Contractor Contact: Joel Jimenez – 408.842.9148

Architect/Engineer: Rail Surveyors and Engineers, Inc.

Architect/Engineer Contact: N/A

Construction Manger Contact: N/A

Description Of Project Scope:

Installation of 24 insulated joint plugs (136 # rail) with 48 thermite welds mainline track.  Replacement of wood ties & replacement of rods for 2 new switch machines.  All work was performed during scheduled night shut-down operations in between revenue hours of commuting trains.

Realignment of 400 lf of siding track

Original Bid Amount: $169,000.00

Change Orders: $30,996.84

Claims: $ ---0---

Final Contract Value: $199,996.84

Original Start Date:

Original Duration:

Original Completion Date:

October, 2009

August, 2010

Time Extension Granted In Days: N/A – C-QC was a subcontractor

Actual Completion Date: August, 2010 for C-QC’s portion of work

Liquidated Damages: None

Recordable Accidents/ RAF: Zero / 0

Lost Time Accidents/ LAF: Zero / 0

OSHA Violations/ Fines: None

DOWNLOAD PDF

Project Brochure - Job 007.jpg
prev / next
Back to Rail / Trackwork
1
Folsom Blue Ravine Rail Road Crossing
1
Hamilton MSE Wall Stabilization
1
PCJPB Signal Optimization
1
Hardwood Spur Track Removal
1
Market & Almaden Rail Replacement
2
MUNI Emergency Rail Replacement
1
Rail Rehabilitation – Hamilton Avenue Freight Crossing Repair
1
Penninsula Corridor Signal Optimization
pipeline.jpg
structures.jpg
shoring-excavation.jpg
duct-bank.jpg
creeks-canals.jpg
concrete-flatwork.jpg